Week 1
February 10, 2018
Deliverables:
a. Administrative Tasks
b. FRDPARRC for Kinematic Coupling
c. Sketch Model for Kinematic Coupling
Week 2
February 17, 2018
a. Concept Design of the Kinematic Coupling Module
b. Analysis and formulating the design spreadsheet
c. Drawings
d. Testing and Comparing results with the predicted performance
Week 3
February 24, 2018
a. FRDPARRC of Elastically Averaged Coupling Module
b. Concept Generation and Analysis
c. Manufacturing
d. Testing
Week 4
January 01, 2020
a. Closing the Design Loop for Kinematic and Elastically Averaged Coupling
b. Consolidated Report
Week 5
a. FRDPARRC for Linear Motion Module
b. Concept Design and Selection
c. Analysis
d. Sketch Model Fabrication and Testing
Week 6
a. Manufacturing of the Linear Motion Slide
b. Drawings
c. Prediction of Tool Point Errors using HTMs
Week 7
a. Testing of the Linear Motion Module
b. Closing the Loop between Design and Testing
Week 9
a. FRDPARRC For Rotary Motion Module
b. Concept Generation and Selection
Week 10
a. Solid Model of the Rotary Motion Module
b. Analysis
c. Manufacturing Drawings for Rotary Motion Module
Week 11
a. Manufacturing of the Rotary Motion Module
b. Testing of the Rotary Motion Module
c. Error Budgeting
Week 12
a. Complete Assembly of the Lathe (including Spindle Mount and Base)
b. Testing